HomeJobCosts

Tub to Shower Conversion Cost in 2026

A typical job is $6,000, in a range of $3,000 – $10,000. On its own that number means very little, so every figure on this page is drawn against the same $24,000 scale: against the other bathroom work you could be quoted for, and against the 20 metros where the job is priced.

Where this sits among bathroom work

national range, typical marked
Accessibility Remodel
$12,000 Walk-In Tub
$10,000 Walk-In Shower
$9,000 Small Remodel
$9,000 Tub-to-Shower Conversion
$6,000 Shower Remodel
$5,000 Half Bath Remodel
$4,500 Tile
$3,500 Shower
$3,500
$0$6k$12k$18k$24k

The same job, 20 metros

same $24,000 scale

Identical work, moved between labour markets. The whole range slides, so a dear metro's low can sit above a cheap metro's high. Colour runs with the metro's labour index, not with good or bad.

Chicago
$7,980 Seattle
$7,740 Minneapolis
$7,620 New York
$7,380 San Diego
$6,900 Portland
$6,900 Los Angeles
$6,840 Philadelphia
$6,720 Denver
$6,420 Las Vegas
$6,060 Phoenix
$5,940 Austin
$5,700 Houston
$5,580 Nashville
$5,580 Atlanta
$5,520 Charlotte
$5,520 Miami
$5,460 Dallas
$5,340 Tampa
$5,220 San Antonio
$5,100
$0$6k$12k$18k$24k

What the $6,000 is made of

Materials move with the market; labour moves with your metro. At 36% materials, only the smaller block is re-priced by the index — which is why a metro 33% above national does not raise this job by 33%.

Materials 36%
Labour 64%
$800 – $4,000 $2,000 – $5,500
$6,000
$3,000 $10,000
Tub-to-Shower Conversion — national range

Put your own numbers on the scale

Trade and project are fixed to this page; changing the metro re-applies its labour index to every figure above.

Cost Calculator

$7,380
$3,690$12,300
estimated total cost
Labor$2,460 $6,765
Materials$985 $4,920
Permit feeVaries by municipality
Total$3,690 $12,300
23% above average in New York
Compare to Other Cities

To get exact pricing for your project, request written quotes from at least three licensed contractors in New York.

Based on aggregated data, converting a bathtub to a shower costs $3,000 to $10,000, with a typical project landing near $6,000. Within that total, materials account for roughly $800 to $4,000 and labor for $2,000 to $5,500 — so labor is the larger share of nearly every quote. The work typically takes 3 to 7 days, and a permit is typically required, because a conversion moves the drain and reworks the supply lines rather than swapping a fixture in place.

The spread from $3,000 to $10,000 is not vagueness. It is three genuinely different jobs sold under one phrase: cutting a step-through into the tub you already own, dropping an acrylic pan and panel kit into the alcove, or demolishing back to the studs and building a tiled walk-in shower. And running underneath all three is the thing that makes this project different from almost any other bathroom line item — the tub is hiding the condition of the wall and floor behind it, and nobody knows what is back there until it comes out.

The Three Routes, and Why They Price So Differently

RouteTypical installed costDurationWhat actually happens
Tub cut$1,200–$2,0001 dayA section of the tub wall is removed and a watertight step-through cap is bonded in. Tub, drain and tile stay.
Prefab / acrylic conversion$3,000–$6,0003–5 daysTub out, new pan set, drain moved, acrylic or composite wall panels installed, valve and door fitted.
Tile-built walk-in shower$6,000–$10,0005–7 daysDemolition to studs, mortar bed or foam pan, waterproof membrane, bonded drain, tile, grout, glass.

The tub cut is the least-known of the three and the cheapest by a wide margin. It is a modification rather than a conversion: a rectangular section of the tub’s outer wall is cut out, the edges are capped, and what remains is a low step-through with the original tub floor, drain and tiled walls. It sits below the $3,000 floor of the conversion range because none of the expensive things happen — no demolition, no disposal, no new pan, no plumbing move, no permit in most jurisdictions. What it does not produce is a flat shower floor: there is still a curb of a few inches, and the surrounding tile is still whatever it was. For a household whose goal is stepping in safely rather than a new bathroom, that trade is the difference between $1,500 and $6,000.

The prefab route is where the median conversion lands. A moulded acrylic, fiberglass or composite base drops into the alcove the tub vacated, and three panels cover the walls. It is fast because the waterproofing arrives as a manufactured part instead of being built on site. Panel wall surrounds run roughly $600 to $2,000 for the three-wall assembly, against $1,200 to $7,000 for a tiled one.

The tile route is the same footprint, four times the labor hours. Tile is not a covering here; it is the final layer over an assembly that has to hold water — a sloped mortar bed or preformed foam pan, a sheet or liquid waterproof membrane, a bonded drain, then thinset, tile and grout. That assembly is why the tile route has an entirely different failure mode from a panel one: a panel leak shows up at a seam, while a tile leak shows up in the ceiling below.

What Is Actually in the Quote

Every conversion is the same handful of parts. Priced individually against the same national dataset, they build up like this:

Line itemLowTypicalHigh
Tub removal, demolition, disposal$150$400$800
Shower pan or base$500$1,400$3,500
Wall surround (acrylic panel low, tile high)$600$2,000$7,000
Shower valve and trim$200$425$900
Drain relocation and rough plumbing$600$1,000$1,600
Shower door or enclosure$400$1,000$3,000
Permit and inspection$100$300$800

Two things fall out of that build-up, and they are more useful than the totals.

First, the floor is real. Add the low column and it comes to roughly $2,550 — below the $3,000 range floor. Almost nobody buys every line at its minimum, because the minimums belong to different jobs: a $500 pan is an acrylic drop-in, and it does not pair with a $3,000 frameless enclosure. The $3,000 floor is the cheapest coherent conversion, not the sum of the cheapest parts.

Second, the ceiling is soft in the other direction. Stack every high figure and the total reaches roughly $16,000 — well past the $10,000 top of the range. That is not an error in the data; it is the point where the scope stops being a conversion. Once the footprint expands, a wall moves, or a custom glass enclosure and a stone bench go in, the job has become a full walk-in shower build ($4,000 to $20,000) or a bathroom remodel ($10,000 to $30,000), and it prices as one. The $10,000 ceiling describes a conversion that stays inside the tub’s own alcove.

The individual lines are priced in detail on their own pages: shower pan installation at $500 to $3,500, shower door installation at $400 to $3,000, shower valve replacement at $200 to $900, and tile shower installation at $1,200 to $7,000.

The Wall Behind the Tub

This is the section most budgets are missing. Survey data published in 2026 puts the share of homeowners who ran into at least one unplanned cost near 70 percent on this specific project, with water damage and structural repair the two most frequent findings.

The reason is structural, not statistical. A bathtub is a sealed vessel bolted against two or three walls and sitting on the subfloor. Water that gets past the caulk line, past a failed grout joint, or past the drain shoe does not appear in the room — it runs down the back of the tub apron and into the framing, where nothing is visible for years. The first person to see that wall is the person who pulls the tub out, on day one of a job that has already been quoted.

So the discovery has a price, and it can be estimated in advance even though it cannot be predicted:

What gets foundTypical cost to correct
Water-damaged drywall and cement board$300–$900
Subfloor rot, partial plywood replacement$400–$1,500
Rotted wall studs or sill plate$500–$2,000
Floor joist repair or sistering$800–$3,000
Mold remediation, bathroom-scale$500–$4,000
Corroded supply lines, galvanized replaced with PEX or copper$500–$2,000
Failed or improperly sloped drain line$600–$1,600
Asbestos testing in a pre-1980 bathroom (floor tile, mastic)$250–$600 test

None of these is exotic. A $1,500 subfloor repair on a $6,000 typical conversion is a 25 percent overrun, and it is roughly the median finding, not the worst case. Published contingency guidance across remodeling data sits at 10 to 15 percent of project cost, which on a $6,000 conversion is $600 to $900 — enough for drywall and a patch of plywood, and not enough for joists and mold together.

There is one thing that shifts the odds before the tub comes out: a bathroom directly above a stained or sagging ceiling, a soft spot in the floor at the tub apron, or a tub that moves when it is leaned on are all visible from the outside, and all three correlate with what gets found behind the wall. Mold that is found is a health-code and remediation question rather than a finish question; the EPA’s mold guidance sets out what remediation involves and at what area thresholds professional handling is normally used. Asbestos in pre-1980 flooring and mastic is a separate abatement track with its own EPA rules, and it is one of the few findings that can stop a job outright until it is cleared.

The Plumbing Line Nobody Budgets

A tub drain and a shower drain are not in the same place. The tub drain sits at one end, tight against the wall, with the overflow stacked above it. A shower drain sits near the center of the pan. Moving it is the single most-missed line item in a conversion budget, and aggregated data prices it at $600 to $1,600.

What that money buys depends entirely on what is under the bathroom floor:

Two related lines usually arrive with it. The valve moves up the wall — a tub-and-shower valve is set around 28 inches off the floor to feed the spout, while a shower-only valve sits at roughly 45 to 48 inches. That means opening the wall, re-running the supply stubs and capping the tub spout drop, and the valve itself is $200 to $900. And the tub spout hole in the wall must be closed, which on a tiled wall means matching tile that is often out of production.

The cheapest conversion is the one that keeps the drain where it is. Some prefab bases are manufactured with an end drain for exactly this reason: they set over the existing tub drain location and eliminate the $600 to $1,600 line entirely. It is the single largest structural saving available on this project.

Cost by Shower Size

The tub’s own footprint — the standard 30 by 60 inch alcove — is the footprint the $3,000 to $10,000 range describes. Anything wider means moving a wall.

Shower footprintPrefab / acrylicTile-builtWhat changes
32 x 32 in (corner stall)$2,500–$5,000$5,000–$8,000Smaller enclosure, but the leftover floor from the tub must be filled and finished
36 x 36 in$3,000–$5,500$5,500–$9,000Common accessible minimum; grab bar blocking added
30 x 60 in (tub alcove, unchanged)$3,000–$6,000$6,000–$10,000No framing change — the baseline conversion
36 x 48 in$3,200–$6,000$6,000–$10,000Fits most alcoves with minor framing
42 x 60 in and larger$5,000–$8,000$9,000–$15,000+Wall relocation, new framing, supply and drain reroute — leaves the conversion band

A smaller shower is not automatically a cheaper job. A 32 by 32 inch corner stall dropped into a 60 inch alcove leaves roughly 2.5 feet of exposed subfloor where the tub used to be, and that floor now needs framing, backer, tile or vinyl and a transition — commonly $400 to $1,200 of work that a full-alcove shower never triggers. The International Residential Code sets the minimum shower compartment at 30 by 30 inches of clear interior area, which is the floor below which a stall cannot legally be built.

Cost by Wall Material

A standard 30 by 60 inch alcove has three walls — about 10 linear feet — carried to a height of 72 to 96 inches, which works out to roughly 60 to 80 square feet of wall surface. That number is what turns a per-square-foot material price into a real line item.

Wall materialInstalled cost per sq ft60–80 sq ft alcoveTypical service life
Fiberglass / acrylic panel kit$8–$25$600–$2,00010–15 years
Ceramic tile$10–$25$600–$2,00020–30 years
Porcelain tile$15–$35$900–$2,80025–40 years
Cultured marble panel$20–$45$1,200–$3,60015–25 years
Natural stone (marble, travertine)$30–$75$1,800–$6,00020–40 years
Solid surface / quartz slab$50–$100$3,000–$8,00025–40 years

The panel-versus-tile decision moves more money than any other single choice in a conversion, and it moves labor more than materials. A three-panel acrylic surround is fitted in a day. The same three walls in tile carry a backer board or mortar bed, a waterproof membrane, layout, cutting, setting, curing overnight, grouting, curing again and sealing — commonly 3 to 5 days of a tile setter’s time. Grout is also a recurring cost that panels do not have: regrouting runs $300 to $2,000 every 8 to 15 years depending on use and ventilation.

Materials vs Labor

ComponentLowTypicalHighShare of a typical project
Materials (pan, panels or tile, valve, door, waterproofing)$800$2,000$4,000~33%
Labor (demolition, plumbing, waterproofing, setting, finish)$2,000$3,500$5,500~58%
Total project$3,000$6,000$10,000100%

Materials and labor together account for $2,800 to $9,500 of the $3,000 to $10,000 band. The remainder — roughly $200 to $500 — is the permit, the dumpster or haul-away, and the small consumables that no line item carries: shims, thinset, silicone, backer screws, blades.

Labor is close to three-fifths of a typical conversion, and it is the reason the project costs multiples of what the parts cost. A conversion is not one trade. It is a demolition day, a plumber for the drain and valve rough-in, an inspection window in the middle of the job while the wall is still open, a waterproofing and setting phase, and a finish day for the door and trim. Bathroom trade labor runs roughly $115 per hour on the national dataset, and the calendar — 3 to 7 days with a mandatory inspection hold — is what makes a small room expensive.

Cost by City

Pans, panels, valves, tile and glass are manufactured goods that ship at broadly national prices. The $2,000 to $5,500 labor line is what moves. Holding materials flat at the $2,000 typical figure and scaling only the $3,500 typical labor line by each metro’s measured labor adjustment factor:

City Labor Adjustment Factor Typical Conversion (materials flat + labor adjusted)Tile-Built Conversion vs. National
Chicago, IL 1.33 $6,655$11,315 +33%
Seattle, WA 1.29 $6,515$11,095 +29%
New York, NY 1.23 $6,305$10,765 +23%
Houston, TX 0.93 $5,255$9,115 −7%
San Antonio, TX 0.85 $4,975$8,675 −15%

Labor adjustment factors are derived from BLS Occupational Employment and Wage Statistics (May 2025): the median ratio of local to national hourly wages across the trades that do this work. How this is calculated.

Chicago carries the highest factor in the dataset at 1.33, which puts a typical conversion near $6,655 against roughly $4,975 in San Antonio at 0.85 — a spread of about $1,680 on identical scope. That ordering surprises people who expect New York (1.23) to top the list: trade labor is priced by union density and local contractor supply, not by how expensive a city is to live in. Phoenix, at 0.99, is the closest thing in the dataset to a national benchmark. The calculator on this page applies any city’s factor to a specific project size and route.

DIY vs Professional

The material side of a prefab conversion is genuinely purchasable by a homeowner. Here is what the parts cost, for the same 30 by 60 inch alcove a contractor would quote at $3,000 to $6,000:

ItemTypical DIY cost
Acrylic or composite shower base, 30 x 60 in$300–$900
Three-piece wall surround kit$500–$1,500
Pressure-balance shower valve and trim$120–$400
Shower door (framed sliding to semi-frameless)$300–$1,200
Cement backer board, membrane, thinset, silicone$150–$350
PVC or ABS drain fittings, trap arm, shims, fasteners$80–$200
Reciprocating saw, oscillating tool, torch or PEX crimper (buy or rent)$100–$300
Dumpster bag or haul-away for cast-iron tub and debris$100–$400
Permit and inspection$100–$800
DIY total$1,750–$6,050

Against a professional $3,000 to $6,000 for the same prefab route, the DIY saving is real but narrower than it looks — roughly $1,250 to $2,000 at the low end, and it evaporates entirely if the drain has to move. Three things concentrate the risk:

Cost per Year of Service

RouteTypical costService lifeCost per year
Tub cut$1,6005–10 years (limited by the original tub)~$210
Prefab / acrylic conversion$4,50010–15 years~$360
Tile-built walk-in shower$8,00020–30 years~$320
Bathtub replacement (keep the tub)$2,50015–25 years~$125

Over the life of the assembly, tile is roughly the same cost per year as acrylic — around $320 versus $360 — despite costing nearly twice as much on the day. The panel kit is cheaper to buy and reaches the end of its life two decades sooner. Tile’s ongoing cost is grout maintenance; acrylic’s is replacement. The tub cut looks cheapest per year until the caveat is applied: its service life is capped by the age of the tub it was cut into, and the modification cannot be undone.

Simply replacing the tub at $1,500 to $8,000 remains the cheapest way to have a working bathing fixture, and it is the correct comparison for a household that has not decided whether it wants the tub gone.

Resale: The One Case Where This Can Cost Money

Stated as data rather than advice: a converted walk-in shower is generally neutral to mildly positive at resale in a home that retains at least one bathtub elsewhere. Buyers over 55 and buyers with mobility constraints reward it; the NAR Remodeling Impact Report tracks bathroom renovation cost recovery in the range of 50 to 70 percent for comparable scopes.

The exception is narrow and it is real. Removing the only tub in the house is the one case where this project can subtract value. Households with infants and small children commonly filter listings on tub presence outright — a home with zero tubs is excluded from the search, not merely scored lower — and that is a filter no finish quality compensates for. In a one-bathroom house, the conversion narrows the buyer pool. In a two-bathroom house with a tub in the hall bath, converting the primary bath is the standard move and carries none of that penalty.

Permits, Timeline and What Slows a Job

A permit is typically required for this project. A like-for-like tub swap frequently is not permitted; a conversion is, because it changes the drain location, the valve and the wall assembly behind the finish. Aggregated data puts the permit at $100 to $800, with inspection fees where they are billed separately. The inspection itself is what shapes the calendar: it happens with the wall open, after the rough plumbing and before the waterproofing goes on, which means the job has a mandatory pause in the middle of it.

Typical duration is 3 to 7 days:

PhaseTypical time
Demolition, tub removal, disposal0.5–1 day
Discovery and repair (if anything is found)0–3 days
Drain relocation, valve rough-in0.5–1 day
Rough inspection hold0.5–2 days (scheduling)
Pan set, waterproofing, panels or tile1–4 days
Grout cure, sealing (tile only)1–2 days
Door, trim, fixtures, final0.5–1 day

The prefab route with no drain move and no discovery is genuinely a 3-day job; the tile route runs at the long end and can reach two weeks once curing windows are included. What turns a 3-day job into a 3-week one is almost always the middle row of that table.

What Drives the Price

How to Reduce a Tub-to-Shower Conversion Cost

The conversion sits between two cheaper projects and one much larger one. Below it, a bathtub replacement at $1,500 to $8,000 keeps the tub and the drain exactly where they are, and a shower pan installation at $500 to $3,500 is the single most expensive component of the conversion bought on its own. Above it, a full shower installation at $1,000 to $8,000 covers a shower built where none existed, and the bathroom remodeling hub prices the full remodel at $10,000 to $30,000 and the walk-in shower build at $4,000 to $20,000.

The individual components each have their own page: tile shower installation at $1,200 to $7,000, shower door installation at $400 to $3,000, shower valve replacement at $200 to $900, and shower regrouting at $300 to $2,000 for the maintenance that follows a tiled conversion. Where the conversion is part of a wider bathroom project, bathroom sink installation runs $280 to $1,400 and a half bath remodel runs $1,500 to $12,000. Drain, supply and venting work beyond the shower itself is compiled under plumbing costs.

The calculator applies a city labor factor to any of these scopes, and the methodology page sets out how the national ranges are compiled and how the city adjustment is measured.

Last updated: August 2026. All figures reflect aggregated national cost data and are not a quote for a specific bathroom. Actual pricing depends on what is found behind the tub, on drain location, and on the local market. See the methodology page for how figures are calculated and sourced.

Questions

How much does a tub to shower conversion cost?
Based on aggregated data, a tub-to-shower conversion costs $3,000 to $10,000, with a typical project near $6,000. Materials account for roughly $800 to $4,000 of that and labor for $2,000 to $5,500. The work usually takes 3 to 7 days and a permit is typically required, because the drain and the supply lines change.
What is the cheapest way to convert a tub to a shower?
A tub cut is the cheapest route in the aggregated data at roughly $1,200 to $2,000. A section of the existing tub wall is removed and a step-through with a watertight cap is fitted in its place, so the tub, the drain and the tiled walls all stay. It sits below the $3,000 floor of a true conversion because there is no demolition, no new pan and no plumbing change — and it leaves a tub-height threshold rather than a flat shower floor.
How much does it cost to convert a tub to a tiled walk-in shower?
A tile-built walk-in shower is the upper half of the range, roughly $6,000 to $10,000 for a standard 30 by 60 inch alcove and higher where the footprint grows. The tile assembly alone — mortar bed, waterproof membrane, bonded drain, tile and grout — is priced at $1,200 to $7,000, against roughly $600 to $2,000 for an acrylic panel surround covering the same three walls.
How much does it cost to move the drain for a shower?
Based on aggregated data, relocating the drain runs $600 to $1,600. A tub drain sits at one end of the tub against the wall; a shower drain sits near the center of the pan. Moving it means opening the floor, cutting into the branch line and re-sloping the trap arm, and in a concrete-slab house it means breaking and repouring the slab, which pushes the line toward the top of that range.
Do you need a permit to convert a tub to a shower?
A permit is typically required. A like-for-like fixture swap often is not permitted, but a conversion changes the drain location, the valve and the waterproofing assembly, which brings it under plumbing code review in most jurisdictions. Aggregated data puts the permit itself at $100 to $800, with inspection fees where they are charged separately.
How often does a tub to shower conversion hit unexpected costs?
Survey data published in 2026 puts the share of homeowners who hit at least one unplanned cost at roughly 70 percent, with water damage and structural repair the most common findings. The tub is a sealed vessel sitting against the wall and floor, so nothing behind it is visible until it comes out. Aggregated data puts a typical discovery at $400 to $1,500 for subfloor repair and $500 to $4,000 for mold remediation.
Does removing a bathtub hurt resale value?
It depends on how many tubs remain. Aggregated data shows a converted shower is generally neutral to mildly positive on resale in a home that keeps at least one tub elsewhere. Removing the only tub in the house is the one case where the change can subtract value, because buyers with small children commonly filter listings on tub presence — a constraint that does not apply to a second or third bathroom.
Does a tub to shower conversion cost vary by city?
Yes, through the labor half of the bill. Pans, panels, valves and tile ship at broadly national prices; the $2,000 to $5,500 labor line moves with the local trade wage. Holding materials flat at $2,000 and scaling the $3,500 mid labor line, a typical conversion runs about $6,655 in Chicago (+33%) against $4,975 in San Antonio (−15%) — a spread of roughly $1,680 on the same scope.

How the scale is built

Base ranges

Metro adjustment

Labor adjustment factors are measured from BLS metropolitan wage data: the median ratio of local to national hourly wages across the ten trades this site prices.

Drawing rules

Every chart on a page shares one axis unless its caption says otherwise. Bars are drawn from zero and are never truncated. Full method →

Last updated: August 2026

Estimates, not quotes. These cost estimates are based on aggregated data from public sources. Actual costs vary by project scope, contractor, and local conditions. Always obtain multiple written quotes from licensed professionals. This site sells nothing, lists no contractors and takes no payment for placement. Methodology →

Cost data last updated: August 2026

Related bathroom costs